How to build your new home, step by step.
From choosing your block to getting the keys, here’s exactly what happens and when. No jargon, no surprises, just a clear path to a home built around your family.
1. Find Your Land:
Choose a block that suits your lifestyle, budget, and the style of home you want to build. Consider proximity to schools, transport, and amenities, as well as block location for home orientation. It’s also important to consider whether your block will be in a new subdivision or any existing block in an older area. Consider the size of the home you wish to build, do you need a larger block for a house and shed? Then it may be worth looking out of town.
2. Complete Land Checks:
- Flood – Check the local council’s flood mapping to see if the block sits in a flood-prone zone, which can affect building requirements and insurance costs.
- Bushfire – If your home is in a Bushfire zone, a Bushfire Attack Level (BAL) assessment will be required, as higher-risk areas require additional construction standards like fire-resistant materials.
- Slope Stability – Steeply sloped or unstable land may need extra engineering (like retaining walls or piers), which adds cost and complexity.
- Noise Categories – Blocks near busy roads, airports, or rail lines may fall under noise attenuation requirements, affecting window and wall specifications.
3. Book a Consult:
Meet with your personal building consultant Tony, to discuss your needs, budget, and the site’s characteristics before committing to a design direction.
4. House Concept Draft:
Your building consultant creates an initial draft floor plan and elevation concept based on your brief, land checks, and lifestyle needs. This can be done from an existing concept by the owner or custom drawn from scratch with us in office.
5. Get an Estimate:
Receive a preliminary cost estimate based on the concept design, giving you a ballpark figure before detailed planning begins.
6. Preliminary Agreement:
Sign a preliminary agreement that outlines the scope of work for detailed design, engineering, and other reports for a set fee (later deducted from the deposit).
7. Engineering & Reports:
Structural engineers assess the site and design footings, slab, and framing specifications tailored to your land’s soil class and conditions.
8. Final Price:
With engineering and specifications locked in, you receive a fixed final quote reflecting the true cost of the build.
9. Contract Deposit:
Sign the formal building contract, which sets out the price, timeline, and terms. Pay the 5% deposit to get your new build underway.
10. Build:
Construction begins, typically progressing through stages – site works, slab, frame, lock-up, fit-out, and completion – with progress payments due at each stage.
BUILDING FAQ's
Do I need to own land before I talk to you?
No. We’re happy to chat before you buy, and we can help you think through whether a block suits the home you want.
What's the difference between the estimate and the final price?
The estimate (step 5) is a ballpark figure based on your concept. The final price (step 8) is a fixed quote, prepared once engineering and specifications are locked in.
What does the preliminary agreement fee cover?
Detailed design, engineering and the reports your build needs. The fee is deducted from your deposit when you sign your building contract.
Can I use my own plan or design?
Yes. We can work from a concept you already have, or custom draw your home from scratch in our office.
What if my block is in a flood or bushfire zone, or on a slope?
It can often still be built on. It may just need extra engineering or construction standards, which is why we check these early.
Do you build on black or 'E' type soil?
Yes, our engineers can design your foundations for highly reactive soil.